Spread moisture-proof film: first lay a mulch film of more than 2.0mm, and align the films so that they do not overlap. Use waterproof adhesive tape to seal the interface, leaving a margin of 5 centimeters around the wall; if it is a solid wood baseboard, the edge of the wall It needs to be raised by more than 50mm (preferably the same height as the skirting line);

2.Pre-laying: Unpack the SPC flooring before installation and place it according to different textures to test the laying effect. (Select SPC floors with messy textures or large color differences and lay them under the bed or in inconspicuous areas);

3. Try to install the first row of floors from the door side of the room. In order to prevent the natural expansion of the SPC floor, a 4-10mm expansion joint should be reserved between the wall and the floor, with the side with the tongue facing outward. , add special pads (should be removed after paving is completed);
4. Installation method of SPC flooring: “First long and then short, first press and then push”: first press the male groove completely into the female groove, push the long side of the floor 45 degrees from outside to inward, and then insert the short side male groove completely Press into the female groove and use the same method to push it inward at an angle. Continue to use the above method to install other floors from the first floor…
5. Note that during the installation process, when installing the last piece of the first row, you need to take the floor to measure the remaining part, and the floor needs to be measured in reverse. Special care must be taken when processing special shapes such as room door frames. Mark first and then cut;
6. When installing the second row of floors, insert the short side tenons into the grooves of the previous row of floors, and gently insert the long side tenons into the corresponding floor grooves;
7. If there are gaps, you can use a rubber mallet to assist in paving;
8. On average, the installation status is checked once every four rows laid to ensure that there are no abnormalities in the installation;
9. When installing the last row of edges, whether to use material head splicing or whole board cutting, the user’s opinion should be solicited and the advantages and disadvantages of the two methods should be explained; after the installation is completed, walk back and forth to ensure that the entire floor is not loose or loose. There is a sense of suspension and no abnormal sound when stepping on it;
10. After the floor paving is completed and there are no abnormalities, take out all the special pads at the reserved expansion joints.